Construction and infrastructure

Connectivity on the construction site from day one, even without a fixed line.

Introduction

Connected and secure

A construction site changes every week and needs connectivity from day one for site offices, cameras, access control and drawings. A fixed line usually only arrives when the building is finished.

A construction site moves, grows and disappears again. Yet site office, cameras, access control and drawings have to be online from day one. We arrange the connection without digging and take it with us to the next location.

Challenges

Do these challenges sound familiar?

These challenges ask for connections that are fast to deliver, move along and withstand a construction environment.

No connection on day one
Fibre comes months later or not at all. Fixed wireless access and bonded mobile links are live within days.
Cameras and access control
Site security needs a stable connection with enough capacity for video.
A site that changes
Cabins move, fences shift. The network has to follow without rebuilding.
Equipment in a rough environment
Dust, rain and vibration. Equipment has to withstand it and be documented properly.
Several contractors on one site
Every party wants its own access. Separated networks keep it manageable.
Moving to the next site
At the end of the project everything moves to the next site, with the same setup.

Get in touch with our engineers

Our team in Nijkerk is ready for you

Give us a call or leave a message. We would like to hear about your network project, your event or any other question. From Nijkerk we support organisations across the Netherlands.

Your message reaches an engineer, not a sales department.