Construction and infrastructure
Connectivity on the construction site from day one, even without a fixed line.
Introduction
Connected and secure
A construction site changes every week and needs connectivity from day one for site offices, cameras, access control and drawings. A fixed line usually only arrives when the building is finished.
A construction site moves, grows and disappears again. Yet site office, cameras, access control and drawings have to be online from day one. We arrange the connection without digging and take it with us to the next location.
Challenges
Do these challenges sound familiar?
These challenges ask for connections that are fast to deliver, move along and withstand a construction environment.
- No connection on day one
- Fibre comes months later or not at all. Fixed wireless access and bonded mobile links are live within days.
- Cameras and access control
- Site security needs a stable connection with enough capacity for video.
- A site that changes
- Cabins move, fences shift. The network has to follow without rebuilding.
- Equipment in a rough environment
- Dust, rain and vibration. Equipment has to withstand it and be documented properly.
- Several contractors on one site
- Every party wants its own access. Separated networks keep it manageable.
- Moving to the next site
- At the end of the project everything moves to the next site, with the same setup.
Solutions
Tailored to your situation
Our strength lies in tailored solutions. Discover in which areas we can support your team.
Get in touch with our engineers
Our team in Nijkerk is ready for you
Give us a call or leave a message. We would like to hear about your network project, your event or any other question. From Nijkerk we support organisations across the Netherlands.
Your message reaches an engineer, not a sales department.



